Today saw the
installation of my plastic wrap and mesh sheets. The oversight which saw me
missing a stormwater pipe under the proposed garage was remedied and the
termimesh prepping started.
As long as we aren’t
hit by a sudden rainstorm, which doesn’t seem likely, the slab should be poured
Saturday.
No comments:
Post a Comment